


In addition to drilling rigs
The price depends on But areas that are rocky or sandy depending on the size and kind of take the drill.
- International Drilling rigs Household water supply
- Consultation on Water systems Of housing projects, condominiums, hotels, resorts
- International Drilling rigs For rice farming, vegetable farms, fruit plantations, it weeks after another.
- Design, develop, supply water to the future.
- Consultation on Water systems of livestock farms, pig farms, chicken and more.
- The search for underground water sources. Drilling rigs Consulting areas
- advised by the groundwater problem.
- both small and large.

Drilling Groundwater
Drilling wells is technically technician drilled by drilling a water cut. But penetration will result Must be at Other Related Whether a company owned drilling contractor. Or hire a drill Even the planned drilling The first major problem associated You can also drill correctly. Choosing this type of drill Based on several key elements such as the objective is to remove the water used. The amount of water needed Depth of groundwater The hardness and the rest of the rock. Budget and costs Problems with the selection of drill core was not a lot in Thailand, for example, one contractor to drill wells in the limestone area of Pak Chong. Nakhon Ratchasima Province Using a Reverse rotary drilling rigs of this type we all know already that could not be drilling in hard rock, such as limestone, which has many holes. This problem is not specific, but not drill down very well. There are issues that require more water. But seep into the hole out with. When this issue is changing the contractor to use a diamond drill. Which was drilled to a depth of 400 feet drilled holes as needed, but 2.5 will broach grow up to enter the casing was not. Because diamond drill rigs underground water is not. The total time lost due to incorrect drilling, about 6 months later, the Department received a request from the relevant government authorities to resolve. Department led drills pneumatic drill. To perform And drilling was completed in 20 days
The construction of wells (Well Completion).
The drill hole (Hole) as well (Water Well) is ready to develop more water available. Called to do well (Well Completion), which includes the design of the well (Well Design) inserting the casing pipe filter. And gravel cover (Gravel Packing).
1. Design Pond
Bo refers to the design details were obtained from drilling wells that had planned to make the most effective. Both water quantity and water quality. The majority of designs Replacing the filter casing and tubing. To the size and position should be such as pipes, filters need to be at least 2/3 of the thickness of the water layer. The position of pipe filters are placed on top. In the event that the well is drilled through salt layers. It determines how well or salty fillings not be mixed with fresh water. And in these ponds, etc. For example, a designer who can bring the real Bo Bo is one of the examples. Electric drill artesian wells
Bo Department of nearby Prapadaeng depth of 900 feet, with the drill bit size 6 1/4 inches, with the aim of drilling water wells and shale. And took up with fresh water. This drill floor gravel pit Clay and alternates to the bottom. The detection of a leading electrical and radioactive water that has a layer of sand at a depth of 252-307 feet.
1. Boring wells with a 15-inch drill bit to put the casing pipe and 8-inch filter.
2. coring wells up to 350 feet each, allowing debris to plug straight into the sand filled up to 900 feet if it had not full of sand or soil.
External input added to its full level of 350 feet.
3. cement plugs in the well of the 15-inch scoop it from 295 feet to 350 feet so as not to salt water contamination of fresh water into the ground floor.
(Distance from 295-307 feet fresh water, which was then sealed with cement. To make the filling, with even better performance).
4. Heat an 8-inch casing from the surface down to a depth of 270 feet from 270-290 feet of pipe filters using the same size pipe.
Filter size 50/1000-inch gap from 290-295 feet in cement at the bottom. Put another piece of casing size.
The well casing off the bottom.
5. grit sizes 1/8 - 1/4 inch casing around the pipe and filter from 265-295 feet.
6. The gap between the well casing and the wall. From surface to 265 feet with cement plugs again to the Upper saltwater into fresh water contamination.
7. All calculated using cement, 18 tons of the pond, it appears that when the development is completed wells. The fresh water needs
2. Put the filter casing pipe.
Using a steel casing in the well to a fixed wall of the pond. And a house given nozzle of the pump with water. All wells are drilled wells in the rocks crumble to enter the casing and to prevent the collapse pit. Wells drilled in the solid rock on which to soak up the water. Be disintegrating Shale as it unattended with the casing. The wells drilled in the solid rock which can not be sustained, either with or without water. You do not need to Well, do not put the casing and the well known open (Open Hole).
Offers good home , get a good home, lifted the ban on wooden houses, concrete church, temple crematorium buildings, schools, factories, twist, turn, move the house, according to Feng Shui needle sticks the needle hit the cement.